2026 Update: PSDS, IETF and REPF are closed. Most businesses fund solar without a grant: the £1m Annual Investment Allowance can give 100% first-year relief on solar, which counts as special-rate plant. See 2026 grants →

South East England, Hampshire · Battery Storage

Commercial Battery Storage in Portsmouth

How Portsmouth businesses fund solar + battery storage in 2026: the Annual Investment Allowance (tax relief, not a grant), export income and, for some public bodies, repayable loans. Connections go through UKPN. An independent guide; we reply by email.

Independent guide
Always check your installer is MCS-certified

Battery storage funding in Portsmouth

No national grant funds business batteries, so these are the things that shape the net cost of a Portsmouth BESS project in 2026.

Annual Investment Allowance

100% first-year tax relief

Battery storage counts as plant and machinery, so a company can usually claim the Annual Investment Allowance: 100% first-year relief on the first £1m of all its qualifying plant spend in the year. For a £200k BESS that is worth about £50k at a 25% corporation tax rate, less at a lower rate. HMRC has no specific guidance on how a standalone battery is classed, so confirm the treatment with your accountant.

VAT

VAT on co-located systems

BESS installed alongside solar PV is standard-rated for VAT (20%) on supply and installation, which a VAT-registered business normally reclaims. The treatment covers the full battery system including inverter, management system and installation labour.

Smart Export Guarantee

Optimise export with BESS

On a time-of-use export tariff, a battery can shift surplus solar into the supplier's higher-priced windows. SEG rates are set by each licensed supplier and must be above zero (Ofgem), so the extra income depends on the tariff you choose.

Salix Finance

Repayable loans for some public bodies

In Scotland, the Salix Scotland Recycling Fund is open for 2026/27, with repayable funding the public body matches equally. In Wales, the Salix Wales Funding Programme offers repayable loans. No open English Salix scheme was found (read 9 November 2026), and Salix does not operate in Northern Ireland.

UK Power Networks (UKPN) — battery connections in Portsmouth

UKPN is the distribution network operator for Portsmouth. Battery storage connections follow the G98/G99 engineering recommendation framework:

  • Under 50 kW (behind the meter): G98 notification only. Typical lead time 5–10 working days. No formal connection offer required. Fastest route for smaller Portsmouth commercial sites.
  • 50 kW – 500 kW: G99 application to UKPN. Formal connection offer issued in 75–95 working days. Protective device settings and protection coordination required. Co-located solar + BESS covered by a single G99 application.
  • Over 500 kW (utility-scale): Full UKPN connection study. Lead times 6–12 months. Pre-application discussions essential. Active Network Management (ANM) conditions may apply depending on local substation capacity.

BESS use cases for Portsmouth businesses

⚡

Peak demand shifting

Charge during off-peak overnight tariff windows, discharge at morning and evening demand peaks. Typical Portsmouth commercial sites save £8–25/MWh on peak demand charges. ROI-positive at current tariff spreads.

☀️

Solar self-consumption

Capture lunchtime solar surplus that would otherwise be exported at a lower export rate and use it in the evening peak, when imported power costs more. Typically increases solar self-consumption from 55–65% to 80–90% for Portsmouth commercial sites.

🔋

Export constraint management

Where UKPN applies export limits on Portsmouth sites, BESS absorbs curtailed generation rather than wasting it. Eliminates the commercial case for oversizing solar that UKPN connection constraints would otherwise prevent.

Illustrative example — not a quote

250 kWp solar + 250 kWh BESS at a Portsmouth commercial building

System capex
  • • 250 kWp rooftop solar PV: ~£175,000
  • • 250 kWh lithium battery system: ~£120,000
  • • Inverter, BMS, installation: ~£35,000
  • • G99 connection / protective devices: ~£15,000
  • Total capex: ~£345,000
Year 1 relief and income
  • • Annual Investment Allowance, at a 25% corporation tax rate: ~£86,250
  • • Annual energy saving: ~£38,000
  • • SEG export income: ~£4,500
  • Net cost after the AIA: ~£258,750

On these assumptions, about £42,500 a year of savings and export income pays back the post-AIA cost in roughly 6 years, and the gross capex in roughly 8 years. Your figures depend on your tariff, load profile, installer quote and tax rate.

Battery storage by sector in Portsmouth

UK Royal Navy and Defence Estate (HMNB Portsmouth — UK\'s largest naval base)
Maritime defence (BAE Systems Maritime Portsmouth — Type 26 frigate construction)
Port operations (Portsmouth International Port — second-busiest cross-Channel ferry port)
Higher education (University of Portsmouth)
Aerospace tier-2 (multiple Hampshire supply chain firms)
Public sector (Queen Alexandra Hospital, Portsmouth Hospitals University NHS Trust)

Other clean energy services in Portsmouth

Battery storage FAQ — Portsmouth

Common BESS questions in Portsmouth

What battery storage grants are available in Portsmouth?
There is no national cash grant for business batteries. Portsmouth companies can usually claim the Annual Investment Allowance (100% first-year relief, worth the tax saved at their own corporation tax rate) on qualifying battery systems, plus Smart Export Guarantee income for surplus solar, at a rate set by your chosen supplier. The IETF closed in July 2025 with no successor and never funded batteries, so plan BESS on capital allowances, finance or a PPA.
How does UKPN connect battery storage in Portsmouth?
UK Power Networks (UKPN) handles G98/G99 applications for battery storage installations in Portsmouth. Behind-the-meter systems under 50kW use G98 notification (5–10 working days). Co-located solar + BESS above 50kW uses a single G99 application with connection offer in 75–95 working days.
What size BESS suits a typical Portsmouth commercial site?
Portsmouth commercial sites typically deploy 50–500 kWh BESS paired with 100–500 kWp solar PV. The optimal size is set from half-hourly (AMR) demand data: a good installer sizes from your actual load profile, not rule-of-thumb ratios.
Can Portsmouth public sector bodies access BESS funding?
It depends on the nation. PSDS Phase 4 closed to new applications in November 2024. In Scotland and Wales, public bodies can apply to Salix's repayable loan schemes (the Scotland Recycling Fund, matched equally by the public body, and the Wales Funding Programme); no open English Salix scheme was found when we last checked (9 November 2026), and Salix does not cover Northern Ireland. Check each scheme's own terms for battery storage.
Is co-located solar + BESS better than standalone battery in Portsmouth?
In almost all cases yes. Co-located solar + BESS in Portsmouth is VAT-standard-rated on both assets (normally recoverable), a single G99 application, and a company can usually claim the Annual Investment Allowance on both assets within its £1m annual limit. The system handles export constraint from UKPN by absorbing surplus rather than curtailing panels.
Free funding review

Get a BESS funding shortlist for your Portsmouth site

Tell us about your site and its energy use. We reply by email about the funding routes that may fit a battery project. Free and no obligation.

No obligation. We reply by email.

Funding by asset class

The allowance depends on the asset, and most pages on this topic get it the wrong way round. Solar PV is special-rate expenditure (HMRC Capital Allowances Manual CA22335), so the 100% year-one route is the Annual Investment Allowance — Full Expensing is a main-rate measure and does not reach it. Battery storage, EV charging and heat pumps are Heat pumps for space or water heating are special-rate: AIA, then the 50% FYA. Standalone batteries are probably main-rate (full expensing for companies), but HMRC has no specific guidance; confirm with your adviser.

Free funding review

Find out which 2026 schemes your site actually qualifies for

What you get
  • 1. A short written funding note naming every scheme your site qualifies for in 2026 — and the ones it does not.
  • 2. Indicative system size and a capex band for your roof.
  • 3. Year-one tax treatment per asset in £ — solar is special-rate expenditure, so the route is the Annual Investment Allowance; heat pumps for building heating are also special-rate integral features, and standalone battery storage is probably main-rate plant (HMRC has no specific guidance, so confirm with your adviser). Most pages get this the wrong way round.
  • 4. Projected SEG export revenue at current rates.
  • 5. Any red-flag eligibility or DNO issues we can see up front.

Covers solar PV, battery storage, EV charging and commercial heat pumps — separately or as one bundled project. If your project is a heat pump or a battery rather than a roof, say so in the message box and the note is written against that asset instead.

What we will not do
  • · We do not pass your details to multiple installers.
  • · We do not run a lead auction, and your phone number is optional.
  • · No marketing lists, no unsolicited calls.
  • · We are an independent funding information service — not an installer.

Five questions. They are the eligibility test itself — scheme eligibility in 2026 turns on sector, tenure, site size and spend, so we cannot shortlist anything without them.

We reply from funding@commercialsolargrants.co.uk. A phone number is not required.