2026 Update: PSDS, IETF and REPF are closed. Most businesses fund solar without a grant: the £1m Annual Investment Allowance can give 100% first-year relief on solar, which counts as special-rate plant. See 2026 grants →

Solar calculator — 2026 UK pricing

Commercial solar calculator — system size, capex, payback after grants.

Enter your annual electricity spend and sector. The calculator estimates the system size that fits your demand, capex at 2026 UK prices, year-one savings, and post-grant payback. No email required, no obligation. To ask which funding routes may fit your site, use the free funding review; we reply by email.

Independent guide
Always check your installer is MCS-certified
Free funding review

Want to know which funding routes may fit?

The calculator uses sector averages. Tell us about your site and we reply by email about the funding routes that may fit.

No obligation. We reply by email.

Funding by asset class

The allowance depends on the asset, and most pages on this topic get it the wrong way round. Solar PV is special-rate expenditure (HMRC Capital Allowances Manual CA22335), so the 100% year-one route is the Annual Investment Allowance — Full Expensing is a main-rate measure and does not reach it. Battery storage, EV charging and heat pumps are Heat pumps for space or water heating are special-rate: AIA, then the 50% FYA. Standalone batteries are probably main-rate (full expensing for companies), but HMRC has no specific guidance; confirm with your adviser.

Free funding review

Find out which 2026 schemes your site actually qualifies for

What you get
  • 1. A short written funding note naming every scheme your site qualifies for in 2026 — and the ones it does not.
  • 2. Indicative system size and a capex band for your roof.
  • 3. Year-one tax treatment per asset in £ — solar is special-rate expenditure, so the route is the Annual Investment Allowance; heat pumps for building heating are also special-rate integral features, and standalone battery storage is probably main-rate plant (HMRC has no specific guidance, so confirm with your adviser). Most pages get this the wrong way round.
  • 4. Projected SEG export revenue at current rates.
  • 5. Any red-flag eligibility or DNO issues we can see up front.

Covers solar PV, battery storage, EV charging and commercial heat pumps — separately or as one bundled project. If your project is a heat pump or a battery rather than a roof, say so in the message box and the note is written against that asset instead.

What we will not do
  • · We do not pass your details to multiple installers.
  • · We do not run a lead auction, and your phone number is optional.
  • · No marketing lists, no unsolicited calls.
  • · We are an independent funding information service — not an installer.

Five questions. They are the eligibility test itself — scheme eligibility in 2026 turns on sector, tenure, site size and spend, so we cannot shortlist anything without them.

We reply from funding@commercialsolargrants.co.uk. A phone number is not required.