EV Charging Grants
in Plymouth
Workplace charging schemes, fleet depot infrastructure, and solar-integrated EV charging for Plymouth businesses. OZEV schemes where eligible, the Annual Investment Allowance and solar co-location. An independent guide; we reply by email.
EV charging funding in Plymouth
The routes that can lower the net cost of a Plymouth commercial EV charging project in 2026, and what to check for each.
Per-socket support, where eligible
OZEV's workplace charging schemes give per-socket support for chargers fitted by OZEV-authorised installers, approved before installation. The amounts and who can apply have changed over time, so check gov.uk for the current OZEV workplace charging schemes and their eligibility before you budget for a Plymouth site.
Check the current OZEV schemes
OZEV has funded charging infrastructure for staff and fleet car parks, which suits Plymouth logistics, distribution and fleet operators with dedicated overnight parking. We have not found a gov.uk source for the depot percentages that circulate online, so check gov.uk for the current schemes and their eligibility before relying on any figure.
100% first-year CT relief on hardware
Chargers are plant and machinery, so charge points, cabling and groundworks you pay for can be claimed under the Annual Investment Allowance, within the £1m annual limit shared with your other plant spend. The value is the tax saved at your own rate: illustratively, £80,000 of spend at the 25% main rate saves up to £20,000. It applies to the cost net of any OZEV grant.
Free daytime EV charging
Pairing rooftop solar with EV charging on your Plymouth site delivers near-zero marginal cost charging during daylight hours. Smart EV charge controllers (Ohme, Indra, MyEnergi) shift charging to solar peak periods automatically. Business solar and EV chargers both carry 20% VAT (chargers are not energy-saving materials), which a VAT-registered business can normally reclaim.
Choosing the right charger for your Plymouth site
| Charger type | Output | Dwell time | Best for |
|---|---|---|---|
| 7 kW AC (Type 2) | 7 kW | 8–10 hours | Commuter car parks, overnight dwell |
| 22 kW AC (Type 2) | 22 kW | 2–4 hours | Shift workers, retail visitor parking |
| 50–150 kW DC Rapid | 50–150 kW | 30–60 min | Fleet depots, van charging, multi-shift |
| 150–350 kW DC HPC | 150–350 kW | 10–30 min | HGV charging, motorway-adjacent logistics |
EV charging opportunities in Plymouth
Other clean energy services in Plymouth
EV charging questions from Plymouth businesses
What EV charging grants are available in Plymouth?
How does solar + EV charging work in Plymouth?
What DNO connection does EV charging need in Plymouth?
Can Plymouth public sector organisations claim EV charging grants?
Plan your Plymouth EV charging infrastructure
Tell us your site, parking and fleet. We reply by email about the funding routes that may fit, from OZEV schemes to the Annual Investment Allowance.
No obligation. We reply by email.
EV charging services near Plymouth
Funding by asset class
The allowance depends on the asset, and most pages on this topic get it the wrong way round. Solar PV is special-rate expenditure (HMRC Capital Allowances Manual CA22335), so the 100% year-one route is the Annual Investment Allowance — Full Expensing is a main-rate measure and does not reach it. Battery storage, EV charging and heat pumps are Heat pumps for space or water heating are special-rate: AIA, then the 50% FYA. Standalone batteries are probably main-rate (full expensing for companies), but HMRC has no specific guidance; confirm with your adviser.
- heat pump capex for commercial buildings
Special-rate integral feature: AIA up to £1m, then the 50% special-rate first-year allowance for companies; full expensing does not apply.
- commercial battery storage costs and ROI
Probably main-rate plant (HMRC has no specific guidance, so confirm with your adviser). Stacks with solar for self-consumption.
- what commercial solar costs per kWp
Capex bands per kWp before any relief.
- rooftop solar on industrial premises
Large roofs, high daytime load — the strongest case.
- the Annual Investment Allowance explained for solar
Solar is special-rate, so AIA is the 100% year-one route.
Find out which 2026 schemes your site actually qualifies for
- 1. A short written funding note naming every scheme your site qualifies for in 2026 — and the ones it does not.
- 2. Indicative system size and a capex band for your roof.
- 3. Year-one tax treatment per asset in £ — solar is special-rate expenditure, so the route is the Annual Investment Allowance; heat pumps for building heating are also special-rate integral features, and standalone battery storage is probably main-rate plant (HMRC has no specific guidance, so confirm with your adviser). Most pages get this the wrong way round.
- 4. Projected SEG export revenue at current rates.
- 5. Any red-flag eligibility or DNO issues we can see up front.
Covers solar PV, battery storage, EV charging and commercial heat pumps — separately or as one bundled project. If your project is a heat pump or a battery rather than a roof, say so in the message box and the note is written against that asset instead.
- · We do not pass your details to multiple installers.
- · We do not run a lead auction, and your phone number is optional.
- · No marketing lists, no unsolicited calls.
- · We are an independent funding information service — not an installer.