2026 Update: PSDS & IETF closed. AIA gives 100% year-one relief on solar. 2026 active stack still delivers 40–60% effective subsidy. See 2026 grants →

Resources

Insights, application guides and funding analysis.

In-depth pieces written for businesses, finance directors and estates teams making real funding decisions. No fluff — every post is anchored to a real application, a real grant window, or a real funding question.

Grants & Funding 11 min read ·

Which Commercial Solar Grants Are Open in 2026?

A current open vs closed register of UK commercial solar grants in 2026 — England, Scotland, Wales and NI funding, plus what to use when grants are shut.

Application Guide 11 min read ·

How to Apply for Commercial Solar Funding 2026 | Playbook

Step-by-step 2026 guide to applying for commercial solar funding — eligibility triage, the document pack, route selection by nation and rejection traps.

Industrial 11 min read ·

Solar Panels for Industrial Buildings: an FD's Guide

Solar panels for industrial buildings in 2026 — cost, post-tax payback, funding routes and the capital decisions a finance director actually has to sign off.

Compliance 9 min read ·

MEES, EPC and Commercial Solar 2026 | The Compliance Driver

How MEES and EPC minimum standards drive commercial solar in 2026 — the 2027/2030 EPC B trajectory, what solar adds to a rating, and the funding stack.

Grants & Funding 11 min read ·

Solar Grants for Businesses 2026: Who Qualifies & How Much

Solar grants for business 2026 — who qualifies, eligibility by sector and UK nation, and how much funding you can actually get. An independent breakdown.

Grants & Funding 9 min read ·

Commercial Solar Grants vs Tax Relief: Which Is Worth More?

Commercial solar grants vs AIA tax relief, compared in 2026: relief rates, the stacking rule, nation-by-nation grant intensities and a verdict.

PPA & Finance 14 min read ·

PPA Negotiation Playbook 2026 | UK Contract Guide

UK commercial solar PPA negotiation — term sheets, offtake rates, performance guarantees and exit clauses. 2026 best-practice guide.

Public Sector 11 min read ·

PSDS Phase 5 Outlook 2026 | What Replaces It

PSDS Phase 4 closed November 2024. What comes next for public sector solar funding in 2026? Salix BAU, Local Growth Fund and Phase 5 chances.

Cost & Pricing 13 min read ·

True Cost of UK Commercial Solar 2026 | Stripped Down

What's actually in a UK 2026 commercial solar quote — module, inverter, mounting, install, DNO, scaffolding, MCS cert, design, monitoring, margin. Real numbers.

Battery Storage 10 min read ·

Battery Storage on Commercial Solar 2026 | When It Pays Back

Battery storage on UK commercial solar 2026 — £350-£550/kWh capex, sector-by-sector payback, self-consumption uplift, dynamic SEG arbitrage.

Project Delivery 11 min read ·

UK DNO Connection Costs 2026 | The Hidden Solar Capex Line

UK DNO connection costs 2026 — G98, G99 fees, reinforcement charges by network. What to budget for commercial solar connections.

Export & SEG 8 min read ·

Smart Export Guarantee 2026 | Best Commercial SEG Tariffs

Best commercial SEG tariffs 2026 — Octopus Outgoing, EDF Variable, British Gas rates compared. How to switch and maximise export income.

Funding Strategy 13 min read ·

PPAs vs Cash vs Grants 2026 | Commercial Solar Decision Tree

Cash, PPA, grant or asset finance? A 2026 decision-tree walking each option's economics for UK businesses now that IETF and PSDS are closed to new applications.

Tax & Finance 10 min read ·

AIA vs Solar Grants 2026 | Why Tax Relief Often Wins

Solar PV is special-rate plant, so Full Expensing does not apply — AIA gives 100% year-one relief, worth ~25% of capex.

REPF 9 min read ·

REPF for Solar | Rural England Prosperity Fund (ended March 2026)

REPF for solar 2026 — Rural England Prosperity Fund application guide, eligible councils, historic capex coverage up to 40%. REPF ended in March 2026.

IETF (closed July 2025) 14 min read ·

IETF Phase 3 Guide | Closure Status & What's Next 2026

A record of the IETF: last Phase 3 window closed 19 April 2024, fund closed July 2025, no successor. What to use instead.

Salix PSDS 12 min read ·

Salix PSDS for Schools | What MATs Do After 2024 Closure

Salix PSDS for schools 2026 — what MATs and academies do after PSDS Phase 4 closure. BAU loans, next phase outlook, application guide.

Free funding review

See which grants your business qualifies for — free 20-minute funding review.

Tell us your sector, roof size and energy spend. We reply by email with a shortlist of grants and the realistic capex you can expect to recover.

No obligation. We don't charge for grant scoping.

Funding by asset class

The allowance depends on the asset, and most pages on this topic get it the wrong way round. Solar PV is special-rate expenditure (HMRC Capital Allowances Manual CA22335), so the 100% year-one route is the Annual Investment Allowance — Full Expensing is a main-rate measure and does not reach it. Battery storage, EV charging and heat pumps are Heat pumps for space or water heating are special-rate: AIA, then the 50% FYA. Standalone batteries are probably main-rate (full expensing for companies), but HMRC has no specific guidance; confirm with your adviser.

Free funding review

Find out which 2026 schemes your site actually qualifies for

What you get
  • 1. A short written funding note naming every scheme your site qualifies for in 2026 — and the ones it does not.
  • 2. Indicative system size and a capex band for your roof.
  • 3. Year-one tax treatment per asset in £ — solar is special-rate expenditure, so the route is the Annual Investment Allowance; heat pumps for building heating are also special-rate integral features, and standalone battery storage is probably main-rate plant (HMRC has no specific guidance, so confirm with your adviser). Most pages get this the wrong way round.
  • 4. Projected SEG export revenue at current rates.
  • 5. Any red-flag eligibility or DNO issues we can see up front.

Covers solar PV, battery storage, EV charging and commercial heat pumps — separately or as one bundled project. If your project is a heat pump or a battery rather than a roof, say so in the message box and the note is written against that asset instead.

What we will not do
  • · We do not pass your details to multiple installers.
  • · We do not run a lead auction, and your phone number is optional.
  • · No marketing lists, no unsolicited calls.
  • · We are an independent funding information service — not an installer.

Five questions. They are the eligibility test itself — scheme eligibility in 2026 turns on sector, tenure, site size and spend, so we cannot shortlist anything without them.

We reply from funding@commercialsolargrants.co.uk. A phone number is not required.