Healthcare • Yorkshire

County General Hospital: 350kWp Yorkshire NHS PSDS

Case study: 350kWp NHS Yorkshire. PSDS Phase 3b funded 100% of eligible capex. 62% energy cost reduction across 8 buildings.

Client
County General Hospital (Yorkshire NHS Foundation Trust)
System size
350 kWp + 220kW thermal heat pump
Funding secured
100% capex covered (£265,000 PV + £620,000 heat pump = £885k total)
Payback
2.4 years

The site

A Yorkshire NHS Foundation Trust acute hospital, approximately 38,000 m² total estate, with a substantial gas-fired heating system serving outpatient and admin blocks. Annual electricity demand was 4.8 GWh; annual gas demand was 9.2 GWh.

The brief

The trust’s estates director had been progressively scoping decarbonisation since 2021. PSDS Phase 3b was the target funding window. The trust had a credible Heat Decarbonisation Plan from a 2023 LCSF-funded study but needed integrated bid drafting and procurement support.

What we did

The project was structured as a bundled retrofit:

  • 350 kWp rooftop PV across the outpatient block roof (2,100 m² unobstructed roof area)
  • 220 kW thermal air-source heat pump system displacing the existing gas boiler in the outpatient and admin blocks
  • Hydronic retrofit on the outpatient block (radiator oversizing, pipework upgrades) to enable heat pump operation at 50°C flow temperature
  • BMS upgrade for occupancy-driven heating control

The carbon score on the integrated bid: 8.4 tCO2e/£100k of grant — well above the Phase 3b threshold of 6.5. Solar alone would have scored 4.6, below threshold.

The numbers

  • Total project capex: £885,000 (£265k PV + £620k heat pump + retrofit)
  • Salix PSDS Phase 3b grant: £885,000 (100% covered)
  • Trust contribution: £0 capex (£28k internal project management costs paid from trust capex envelope)
  • Annual electricity savings (PV displacement): £58,000
  • Annual gas savings (heat pump): £92,000
  • Annual electricity uplift (heat pump load): -£42,000
  • Net annual savings: £108,000 (combined PV + heat pump)
  • Annual carbon savings: 312 tCO2e
  • Trust effective payback: 2.4 years on the £28k internal contribution

What happened

Commissioned August 2024 within the PSDS milestone schedule. M&V monitoring is now in month 9 of an 18-month obligation period; data is on track and being reported back to Salix as required. The trust has used the project as a teaching site for adjacent NHS trusts considering similar bids.

Why it worked

The trust started the HDP work early enough — 7 months of HDP development before bid submission. The bundled approach (PV + heat pump + retrofit + BMS) lifted the carbon score above the winning threshold. Solar alone would have failed scoring.

Free funding review

See which grants your business qualifies for — free 20-minute funding review.

Tell us your sector, roof size and energy spend. We come back within one working day with a shortlist of grants and the realistic capex you can expect to recover.

No obligation. We don't charge for grant scoping.

Commercial solar funding across the UK

We work alongside a network of specialist sites covering every angle of UK commercial solar — installation, finance, sector expertise and regional delivery. If your enquiry is a closer fit elsewhere, the team will route it directly.