2026 Update: PSDS & IETF closed. Full Expensing permanent. 2026 active stack still delivers 40–60% effective subsidy. See 2026 grants →

Agriculture • Devon, South West

Green Valley Farms: 150kWp Devon REPF + Full Expensing

A Devon mixed farm with 150kWp PV, REPF-funded at 35% capex contribution plus Full Expensing tax relief, hitting 4.8-year payback and £24k annual savings.

Client
Green Valley Farms
System size
150 kWp rooftop
Funding secured
REPF + AIA stacked
Payback
4.8 years

The site

A 280-hectare mixed dairy and arable farm in mid-Devon. Electricity demand 320,000 kWh/year, driven by a robotic parlour, ice-bank cooling, and a grain-drying system that runs intensively August-October. The farm operates as an LLP rather than a limited company, so AIA applies rather than Full Expensing.

The brief

Owner wanted to scope a 150 kWp install on the parlour and grain-shed roofs. Annual electricity bill had risen 38% in 24 months due to grid price inflation and the third milking robot increasing demand.

What we did

The LLP structure meant Full Expensing did not apply, but Annual Investment Allowance gives 100% first-year relief on plant up to £1m — the same effect for a project of this size. We screened the project for REPF eligibility through Devon County Council’s economic development team.

The REPF narrative anchored on agricultural productivity outcomes: the cost saving allowed competitive contract grain-drying for two neighbouring farms, supporting one new seasonal job and £58,000 of additional rural enterprise revenue. This productivity framing is what scores well in REPF — pure decarbonisation pitches sit in the queue with every other generic application.

The numbers

  • Headline capex: £115,000
  • REPF grant: £40,250 (35% effective rate against eligible capex)
  • AIA tax relief: £18,650 (~25% of net capex)
  • Net cost: £56,100
  • Annual savings (electricity displacement + SEG export): £24,000
  • Payback: 4.8 years

What happened

Project commissioned May 2024. Self-consumption averaged 82% in year 1 (vs 78% modelled) thanks to the ice-bank cooling continuous load. Owner has since scoped a 60 kWp ground-mount expansion on a south-facing pasture corner.

Why it worked

Productivity narrative was decisive in the REPF application. A pure decarbonisation pitch would have sat in the queue; the contract drying outcome got the application to the top of the council’s scoring.

Free funding review

See which grants your business qualifies for — free 20-minute funding review.

Tell us your sector, roof size and energy spend. We come back within one working day with a shortlist of grants and the realistic capex you can expect to recover.

No obligation. We don't charge for grant scoping.

Commercial solar funding across the UK

We work alongside a network of specialist sites covering every angle of UK commercial solar — installation, finance, sector expertise and regional delivery. If your enquiry is a closer fit elsewhere, the team will route it directly.