EV charging funding in Coventry
Four stacking funding mechanisms apply to most Coventry commercial EV charging projects in 2026.
Up to £14,000 per business
The WCS covers up to £350 per socket on up to 40 sockets — up to £14,000 per Coventry business site. Available to businesses, charities and public sector employers. The grant applies to both AC and DC chargers installed by OZEV-approved installers. Apply via DVSA portal before installation.
Up to 75% of installation costs
The Electric Vehicle Infrastructure Grant (EVIG) covers up to 75% of the cost of installing EV charge points at fleet depots, up to £15,000 per site. Ideal for Coventry logistics, distribution and commercial fleet operators with dedicated parking areas and multiple vehicles to charge overnight.
100% first-year CT relief on hardware
EV charging infrastructure (charge points, cabling, groundworks) qualifies for the Annual Investment Allowance — 100% deducted from corporation tax in Year 1. For a £80,000 depot charging installation, that's a £20,000 tax saving at 25% corporation tax. Applies to the full installed cost above any OZEV grant received.
Free daytime EV charging
Pairing rooftop solar with EV charging on your Coventry site delivers near-zero marginal cost charging during daylight hours. Smart EV charge controllers (Ohme, Indra, MyEnergi) shift charging to solar peak periods automatically. Combined solar + EV qualifies for 0% VAT on both assets simultaneously.
Choosing the right charger for your Coventry site
| Charger type | Output | Dwell time | Best for |
|---|---|---|---|
| 7 kW AC (Type 2) | 7 kW | 8–10 hours | Commuter car parks, overnight dwell |
| 22 kW AC (Type 2) | 22 kW | 2–4 hours | Shift workers, retail visitor parking |
| 50–150 kW DC Rapid | 50–150 kW | 30–60 min | Fleet depots, van charging, multi-shift |
| 150–350 kW DC HPC | 150–350 kW | 10–30 min | HGV charging, motorway-adjacent logistics |
EV charging opportunities in Coventry
Other clean energy services in Coventry
EV charging questions from Coventry businesses
What EV charging grants are available in Coventry?
How does solar + EV charging work in Coventry?
What DNO connection does EV charging need in Coventry?
Can Coventry public sector organisations claim EV charging grants?
Plan your Coventry EV charging infrastructure
Free site assessment — we scope charger count, grid capacity, solar integration and full grant funding in one visit.
No obligation. We don't charge for grant scoping.
EV charging services near Coventry
Funding by asset class
The allowance depends on the asset, and most pages on this topic get it the wrong way round. Solar PV is special-rate expenditure (HMRC Capital Allowances Manual CA22335), so the 100% year-one route is the Annual Investment Allowance — Full Expensing is a main-rate measure and does not reach it. Battery storage, EV charging and heat pumps are main-rate plant, so Full Expensing genuinely does apply to those.
- what a commercial heat pump actually costs in 2026
Main-rate plant, so Full Expensing does apply here.
- what commercial battery storage costs per kWh
Main-rate plant. Stacks with solar for self-consumption.
- the real cost of a commercial solar install
Capex bands per kWp before any relief.
- industrial rooftop solar economics
Large roofs, high daytime load — the strongest case.
- claiming the Annual Investment Allowance on solar
Solar is special-rate, so AIA is the 100% year-one route.
Find out which 2026 schemes your site actually qualifies for
- 1. A short written funding note naming every scheme your site qualifies for in 2026 — and the ones it does not.
- 2. Indicative system size and a capex band for your roof.
- 3. Year-one tax treatment per asset in £ — solar is special-rate expenditure, so the route is the Annual Investment Allowance; battery storage and heat pumps are main-rate plant, where Full Expensing does apply. Most pages get this the wrong way round.
- 4. Projected SEG export revenue at current rates.
- 5. Any red-flag eligibility or DNO issues we can see up front.
Covers solar PV, battery storage, EV charging and commercial heat pumps — separately or as one bundled project. If your project is a heat pump or a battery rather than a roof, say so in the message box and the note is written against that asset instead.
- · We do not pass your details to multiple installers.
- · We do not run a lead auction, and we never ask for your phone number.
- · No marketing lists, no unsolicited calls.
- · We are an independent funding consultancy — not an installer, and we take no installer commission.