2026 Update: PSDS & IETF closed. Full Expensing permanent. 2026 active stack still delivers 40–60% effective subsidy. See 2026 grants →

West Midlands, Black Country · EV Charging

EV Charging Grants in Wolverhampton

Workplace charging schemes, fleet depot infrastructure, and solar-integrated EV charging for Wolverhampton businesses. OZEV grants + Full Expensing + solar co-location. Site survey within one week.

4.9
180+
Projects
£42m
Secured
4.5yr
Avg Payback
MCS NICEIC RECC TRUSTMARK

EV charging funding in Wolverhampton

Four stacking funding mechanisms apply to most Wolverhampton commercial EV charging projects in 2026.

OZEV Workplace Charging Scheme

Up to £14,000 per business

The WCS covers up to £350 per socket on up to 40 sockets — up to £14,000 per Wolverhampton business site. Available to businesses, charities and public sector employers. The grant applies to both AC and DC chargers installed by OZEV-approved installers. Apply via DVSA portal before installation.

Fleet & Depot EVIG Grant

Up to 75% of installation costs

The Electric Vehicle Infrastructure Grant (EVIG) covers up to 75% of the cost of installing EV charge points at fleet depots, up to £15,000 per site. Ideal for Wolverhampton logistics, distribution and commercial fleet operators with dedicated parking areas and multiple vehicles to charge overnight.

Full Expensing

100% first-year CT relief on hardware

EV charging infrastructure (charge points, cabling, groundworks) qualifies for Full Expensing — 100% deducted from corporation tax in Year 1. For a £80,000 depot charging installation, that's a £20,000 tax saving at 25% corporation tax. Applies to the full installed cost above any OZEV grant received.

Solar Integration

Free daytime EV charging

Pairing rooftop solar with EV charging on your Wolverhampton site delivers near-zero marginal cost charging during daylight hours. Smart EV charge controllers (Ohme, Indra, MyEnergi) shift charging to solar peak periods automatically. Combined solar + EV qualifies for 0% VAT on both assets simultaneously.

Choosing the right charger for your Wolverhampton site

Charger type Output Dwell time Best for
7 kW AC (Type 2)7 kW8–10 hoursCommuter car parks, overnight dwell
22 kW AC (Type 2)22 kW2–4 hoursShift workers, retail visitor parking
50–150 kW DC Rapid50–150 kW30–60 minFleet depots, van charging, multi-shift
150–350 kW DC HPC150–350 kW10–30 minHGV charging, motorway-adjacent logistics
Why co-locate solar + EV charging in Wolverhampton
Near-zero EV fuel costSolar generation during business hours covers the majority of daytime EV charging, reducing effective electricity cost per mile to 1–2p vs 5–8p from grid.
Single 0% VAT claimSolar PV + co-located EV infrastructure qualifies for a single 0% VAT claim under the energy-saving materials rules. 20% saving on combined project value.
Single National Grid Electricity Distribution (NGED) connectionCombining solar + EV + BESS in a single National Grid Electricity Distribution (NGED) G99 application reduces connection cost and lead time compared to three separate applications.

EV charging opportunities in Wolverhampton

Automotive (JLR i54 engine plant — JLR's largest UK engine facility)
Black Country metal-forming and casting (legacy heavy industry transitioning)
Aerospace tier-2 (Moog, ITP Aero supply chain)
Manufacturing (UTC Aerospace, smaller specialist firms)
Public sector (Royal Wolverhampton NHS Trust)

Other clean energy services in Wolverhampton

EV Charging FAQ — Wolverhampton

EV charging questions from Wolverhampton businesses

What EV charging grants are available in Wolverhampton?
Wolverhampton businesses can access the OZEV Workplace Charging Scheme (up to £350/socket, 40 sockets = £14,000), the Electric Vehicle Infrastructure Grant (up to 75% of depot installation costs), Full Expensing on hardware above any grant, and 0% VAT when co-located with solar PV.
How does solar + EV charging work in Wolverhampton?
Co-located solar + EV in Wolverhampton uses smart charge controllers to shift EV charging to solar generation hours. Typically increases solar self-consumption from 55–65% to 75–85% and cuts EV per-mile electricity cost to 1–2p vs 5–8p grid import.
What DNO connection does EV charging need in Wolverhampton?
National Grid Electricity Distribution (NGED) handles EV charging connections in Wolverhampton. Chargers above 3.68 kW need notification or formal G99 application. Fleet depot installations of 100+ kW need a G99 application. We manage all National Grid Electricity Distribution (NGED) applications end-to-end.
Can Wolverhampton public sector organisations claim EV charging grants?
Yes. The OZEV WCS and EVIG grants apply to public sector bodies. NHS trusts, councils and universities in Wolverhampton can also access Salix Finance loans to fund EV charging infrastructure alongside heat pump and solar projects.
Free funding review

Plan your Wolverhampton EV charging infrastructure

Free site assessment — we scope charger count, grid capacity, solar integration and full grant funding in one visit.

No obligation. We don't charge for grant scoping.

Commercial solar funding across the UK

We work alongside a network of specialist sites covering every angle of UK commercial solar — installation, finance, sector expertise and regional delivery. If your enquiry is a closer fit elsewhere, the team will route it directly.