EV Charging Grants
in Stoke-on-Trent
Workplace charging schemes, fleet depot infrastructure, and solar-integrated EV charging for Stoke-on-Trent businesses. OZEV grants + Full Expensing + solar co-location. Site survey within one week.
EV charging funding in Stoke-on-Trent
Four stacking funding mechanisms apply to most Stoke-on-Trent commercial EV charging projects in 2026.
Up to £14,000 per business
The WCS covers up to £350 per socket on up to 40 sockets — up to £14,000 per Stoke-on-Trent business site. Available to businesses, charities and public sector employers. The grant applies to both AC and DC chargers installed by OZEV-approved installers. Apply via DVSA portal before installation.
Up to 75% of installation costs
The Electric Vehicle Infrastructure Grant (EVIG) covers up to 75% of the cost of installing EV charge points at fleet depots, up to £15,000 per site. Ideal for Stoke-on-Trent logistics, distribution and commercial fleet operators with dedicated parking areas and multiple vehicles to charge overnight.
100% first-year CT relief on hardware
EV charging infrastructure (charge points, cabling, groundworks) qualifies for Full Expensing — 100% deducted from corporation tax in Year 1. For a £80,000 depot charging installation, that's a £20,000 tax saving at 25% corporation tax. Applies to the full installed cost above any OZEV grant received.
Free daytime EV charging
Pairing rooftop solar with EV charging on your Stoke-on-Trent site delivers near-zero marginal cost charging during daylight hours. Smart EV charge controllers (Ohme, Indra, MyEnergi) shift charging to solar peak periods automatically. Combined solar + EV qualifies for 0% VAT on both assets simultaneously.
Choosing the right charger for your Stoke-on-Trent site
| Charger type | Output | Dwell time | Best for |
|---|---|---|---|
| 7 kW AC (Type 2) | 7 kW | 8–10 hours | Commuter car parks, overnight dwell |
| 22 kW AC (Type 2) | 22 kW | 2–4 hours | Shift workers, retail visitor parking |
| 50–150 kW DC Rapid | 50–150 kW | 30–60 min | Fleet depots, van charging, multi-shift |
| 150–350 kW DC HPC | 150–350 kW | 10–30 min | HGV charging, motorway-adjacent logistics |
EV charging opportunities in Stoke-on-Trent
Other clean energy services in Stoke-on-Trent
EV charging questions from Stoke-on-Trent businesses
What EV charging grants are available in Stoke-on-Trent?
How does solar + EV charging work in Stoke-on-Trent?
What DNO connection does EV charging need in Stoke-on-Trent?
Can Stoke-on-Trent public sector organisations claim EV charging grants?
Plan your Stoke-on-Trent EV charging infrastructure
Free site assessment — we scope charger count, grid capacity, solar integration and full grant funding in one visit.
No obligation. We don't charge for grant scoping.